First, carry out basic preparations, including topographic survey and cleanup of the site.

Regarding the construction method of the footbridge beret piece, the specific steps are as follows:
First, carry out basic preparations, including topographic survey and cleanup of the site.Then, the prefabrication and transportation of footbridge beret pieces are carried out to ensure that their quality meets the standards.During the installation process, it is necessary to locate accurately and use hoisting equipment for installation.After installation, welding and fixing should be carried out to ensure the stability of the structure.Then conduct quality inspections to ensure that all indicators meet the standards.Finally, the bridge deck laying and protection work is carried out, including the laying of steel plates and the installation of protective barriers.During the construction process, we should pay attention to safety and follow relevant regulations to ensure the quality and service life of the footbridge beret.
The above construction methods are for reference only, and the actual construction needs to be adjusted and optimized according to specific circumstances.
Key word:
Prev
Prev
Recommended
What is the composition of Belle Bridge?
2025-02-19
What is the scope of use of steel bridge
2025-01-07
2025-01-07
2025-01-07
Share article